Risk Factors Contributing to Time Delay and Cost Overruns in Bridge Construction Projects on Prithvi Highway in Nepal
Main Article Content
Abstract
This study purpose to identify the fundamental factors that causes delay in bridge construction project at Mugling to Dharke section (68 KM) of Prithive Highway in Nepal, which results risk factor contributing to delay and cost overrun allocated for this type of engineering project and cause major issues for both the client and the contractor. The difference between the cost at completion and that originally estimated, known as cost overrun. The construction of bridge is often beset by challenges like time delays and cost overruns, resulting in addition of project cost and decreased public satisfaction. This study’s research methodology involves a literature review and a questionnaire survey. Thoroughly literature review, thirty-nine common risk factor causes of delay were identified. Questionnaire survey is accomplished among construction professionals and technical expert of bridge project. Drawing upon existing literature and case studies, the abstract highlights key factors contributing to delays and overruns, including design changes, unforeseen site conditions, regulatory problems, and inadequate project management practices.
Article Details
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
How to Cite
References
Akhund, M. A., Imad, H. U., Memon, N. A., Siddiqui, F., Khoso, A. R., & Panhwar, A. A. (2018). Contributing factors of time overrun in public sector construction projects. Engineering, Technology & Applied Science Research, 8(5), 3369-3372.
Al-Hazim, N., & Salem, Z. A. (2015). Delay and cost overrun in road construction projects in Jordan. International Journal of Engineering & Technology, 4(2), 288.
Edison, J. C., & Singla, H. K. (2020). Development of a scale for factors causing delays in infrastructure projects in India. Construction Economics and Building, 20(1), 36-55.
Gupta, C., & Kumar, C. (2020). Study of factors causing cost and time overrun in construction projects. Int. J. Eng. Res. Technol, 9(10), 202-206.
Idrees, S., & Shafiq, M. T. (2021). Factors for Time and Cost Overrun in Public Projects. Journal of Engineering, Project & Production Management, 11(3).
Iqbal, A., Rehman, H. S. U., Munir, M., Ashiq, M., Omar, A., Haider, Z., ... & Jahanzaib, M. (2019). Time and cost overrun in construction projects of Pakistan. Pakistan Journal of Engineering and Technology, 2(2), 22-29.
Khair, K., Farouk, H., Mohamed, Z., & Mohammad, R. (2016). Causes and effects of delay factors in road construction projects in Sudan. International Journal of Applied Engineering Research, 11(18), 9526-9533.
Prasad, K. V., Vasugi, V., Venkatesan, R., & Bhat, N. S. (2019). Critical causes of time overrun in Indian construction projects and mitigation measures. International Journal of Construction Education and Research, 15(3), 216-238. http://doi.org/10.1080/15578771.2018.1499569
Sohu, S., & Chandio, A. F. (2019). Identification of causes and minimization of delays in highway projects of Pakistan. Mehran University Research Journal of Engineering & Technology, 38(1), 103-112.
Thapanont, P., Santi, C., & Pruethipong, X. (2018). Causes of delay on highway construction projects in Thailand. In MATEC Web of Conferences (Vol. 192, p. 02014). EDP Sciences.